CONSTRUCTION TWIN

A living AI representation of the project.

Connect geometry, schedule, evidence and intelligence to understand the project in space, time and context — and to see where it is heading.

STATION 02 / PROJECT TWIN LIVE
BADC

Drag to orbit

SELECTED ENTITY

Roof Zone B

StatusDelayed
Progress67%
Variance+4d
RiskHigh

ROOF-B-023 · Connection plate install

EvidenceDR-241DLV-CP23NCR-0091
Ask Twin →
4D PROJECT INTELLIGENCE

See. Understand. Predict.

Compare baseline, actual progress and a forecast range built from reconciled actuals rather than reported ones.

4D PROJECT INTELLIGENCE

Baseline · Actual · Forecast range

Data date · Day 68

Interactive illustration — drag the data date to see how a forecast cone responds.

Planned progress 60%Actual progress 53%P50 variance +16.0dP90 variance +28.0dP10 (best case) Day 128
ASK TWIN

Evidence-backed project reasoning.

Every answer is constructed from records you can open. Where evidence is missing, the Twin says so instead of producing a plausible sentence.

Every claim below is built from records, not retrieved text. Open one to see the source.

ASK TWINSAMPLE89% confidence

Roof Zone B is 4 days behind baseline and has consumed its float. Two causes account for most of the variance, and a third is adding to it.

  1. Crane unavailability on 15 August cost a full shift of steel erection.

  2. A partial connection-plate delivery on 16 August left the crew short of 42 units, with the balance not due until 24 August.

  3. Rework on six under-torqued connections is adding an estimated 1.5 days.

  4. The activity is now critical, with two successors exposed.

Why this confidence: Four independent records, three of them primary sources, all within the variance window. No contradicting evidence found.

Recommended actionReview mitigation scenario S-04 with the Project Director
Provenance
Model-backed
Retrieval
BM25
Schedule sample
42 activities

The product reports these fields on every answer. This demo shows the same ones.

CAPABILITIES

What the Twin holds.

IFC / BIM ingestion

IFC semantic ingestion with IfcOpenShell, and a transparent fallback parser that labels its own reduced fidelity rather than hiding it.

3D Tiles & LOD streaming

IFC converted to GLB and 3D Tiles 1.1, with LOD0/1/2 and Cesium spatial streaming for models too large to load whole.

Distributed asset pipeline

Conversion runs as partitioned jobs with worker leases, cancel and resume, and a content-addressed cache that skips work already done.

4D schedule link

Activities bound to entities, with baseline, actual and forecast state per element, and an S-curve derived from the schedule itself.

Portfolio & comparison

A portfolio view across projects and a side-by-side comparison workspace, not just a single-project dashboard.

Verifiable audit trail

Observations, recommendations, approvals and executions written to a hash-chained log, with an endpoint that re-walks the chain and reports the first break.

Realtime & offline

Live project events over WebSocket with Redis fan-out across replicas, and a cached shell that keeps working offline, queueing comments until reconnect.

Evidence-backed reasoning

BM25 retrieval over project records, derived claims, verified citations, and an enforced downgrade when nothing matches.

Probabilistic forecast

P10/P50/P90 computed from measured activity slippage, each result reporting its model, sample size and calibration state.